Indian Electricity Rules, 1956
UPPCL JE ELECTRICAL TEST SERIES
Rules No | Use For |
PRELIMINARY | |
1 | Short title and commencement |
2 | Definitions |
3 | Authorization |
INSPECTORS | |
4 | Qualifications of Inspectors |
4A | Appointment of Officers to assist the Inspectors |
4B | Qualifications of Officers appointed to assist the Inspectors |
5 | Entry and inspection |
6 | Appeals |
7 | Amounts of fees |
8 | Incidence of fees recoverable in the cases of dispute |
9 | Submission of records |
10 | List of Consumers |
Indian Electricity Rules PDF For UPPCL JE | |
LICENSE | |
11 | Application for license |
12 | Copies of maps and draft license for public inspection |
13 | Contents of draft license |
14 | Form of draft license |
15 | Advertisement of application and contents thereof |
16 | Amendment of draft license |
17 | Local Enquirer |
18 | Approval of draft license |
19 | Notification of grant of license |
20 | Date of commencement of license |
21 | Deposits of maps |
22 | Deposit of printed copies |
23 | Application for written consent of State Government |
24 | Amendment of license |
25 | Sale of plans |
26 | Preparation and submission of accounts |
27 | Model conditions of supply |
28 | Forms of requisitions |
Indian Electricity Rules PDF For UPPCL JE | |
GENERAL SAFETY REQUIREMENTS | |
29 | Construction installation, protection, operation and maintenance of electric supply lines and apparatus |
30 | Service lines and apparatus on consumer’s premises |
31 | Cut-out on consumer’s premises |
32 | Identification of earthen and earthed neutral conductors and position of switches and cut-outs therein |
33 | Earthed terminal on consumer’s premises |
34 | Accessibility of bare conductors |
35 | Danger notices |
36 | Handling of electric supply lines and apparatus |
37 | Supply to vehicles, cranes, etc., |
38 | Cables for potable or transportable apparatus |
39 | Cables protected by bituminous materials |
40 | Street boxes |
41 | Distinction of different circuits |
41A | Distinction of the installations having more than one feed |
42 | Accidental charge |
43 | Provisions applicable to protective equipment |
44 | Instructions for restoration of persons suffering from electric shock |
44A | Intimation of accident |
45 | Precautions to be adopted by consumers, owners, occupies, electrical contractors, electrical workmen and suppliers |
46 | Periodical inspection and testing of consumer’s installation |
GENERAL CONDITIONS RELATING TO SUPPLY AND USE OF ENERGY | |
47 | Testing consumer’s installation |
47A | Installation and testing of generating units |
48 | Precautions against leakage before connection |
49 | Leakage on consumer’s premises |
50 | Supply and use of energy |
Indian Electricity Rules PDF For UPPCL JE | |
50A | Additional provisions for supply and use of energy in multi stored buildings (more than 15 meters in height) |
51 | Provisions applicable to medium, high or extra-high voltage installations |
52 | Appeal to Inspector in regard to defects |
53 | Cost of inspection and test of consumer’s installation |
54 | Declared voltage of supply to consumer |
55 | Declared frequency of supply to consumer |
56 | Sealing of meters and cut-outs |
57 | Meters, maximum demand indicators and other apparatus on consumer’s premises |
58 | Point of commencement of supply |
59 | Precautions against failure of supply – Notice of failures |
ELECTRIC SUPPLY LINES, SYSTEMS AND APPARATUS FOR LOW AND MEDIUM VOLTAGES |
|
60 | Test for resistance of insulation |
61 | Connection with earth. |
61A | Earth leakage protective device |
62 | System at medium voltage |
ELECTRIC SUPPLY LINES, SYSTEMS AND APPARATUS FOR HIGH AND EXTRA-HIGH VOLTAGES |
|
63 | Approval by Inspector |
64 | Use of energy at high and extra-high voltage |
64A | Additional provisions for use of energy at high and extra-high voltage |
Indian Electricity Rules PDF For UPPCL JE | |
65 | Testing, operation and maintenance |
66 | Metal-sheathed electric supply lines – precautions against excess leakage |
67 | Connection with earth |
68 | General conditions as to transformation and control of energy |
69 | Pole type sub-stations |
70 | Condensers |
71 | Additional provisions for supply to high voltage luminous tube sign installations |
72 | Additional provisions for supply to high voltage electrode |
73 | Supply to X-ray and high frequency installation |
OVERHEAD LINES, UNDER GROUND CABLES AND GENERATING STATIONS |
|
74 | Material and strength |
75 | Joints |
76 | Maximum stresses – factors of safety |
77 | Clearance above ground of the lowest conductor |
78 | Clearance between conductors and trolley wires |
79 | Clearance from buildings of low and medium voltage lines and service lines |
80 | Clearance from buildings of high and extra-high voltage lines |
81 | Conductors at different voltages on same supports |
82 | Erection of or alteration to buildings, structures, flood banks and elevation of roads |
82A | Transporting and storing of material near overhead lines |
83 | Clearance- general |
84 | Routes- proximity to aerodromes |
85 | Maximum intervals between supports |
86 | Conditions to apply where telecommunications lines and power lines are carried on same supports |
87 | Lines crossing or approaching each other |
88 | Guarding |
Indian Electricity Rules PDF For UPPCL JE | |
89 | Service-lines from overhead lines |
90 | Earthing |
91 | Safety and protective devices |
92 | Protection against lightning |
93 | Unused overhead lines |
ELECTRIC TRACTION | |
94 | Additional rules for electric traction |
95 | Voltage of supply to vehicle |
96 | Insulation of lines |
97 | Insulation of returns |
98 | Proximity to metallic pipes, etc. |
99 | Difference of potential on return |
100 | Leakage on conduit system |
101 | Leakage on system other than conduit system |
102 | Passengers not to have access to electric circuit |
103 | Current density in rails |
104 | Isolation of secretions |
105 | Minimum size and strength of trolley – wire |
106 | Height of trolley – wire and length of span |
107 | Earthing of guard wires |
107A | Proximity to magnetic observations and laboratories |
108 | Records |
Indian Electricity Rules PDF For UPPCL JE | |
ADDITIONAL PRECAUTIONS TO BE ADOPTED IN MINES, OIL FIELDS | |
109 | Applications of Chapter |
110 | Responsibility for observance |
111 | Notices |
112 | Plans |
113 | Lighting, communications and fire precautions |
114 | Isolation and fixing of transformer , switchgear, etc. |
115 | Method of earthing |
116 | Protective equipment |
117 | Earthing metal,etc. |
118 | Voltage limits |
119 | Transformers |
120 | Switchgear and terminals |
121 | Disconnection of supply |
122 | Cables |
123 | Flexible cables |
124 | Portable and transportable machines |
125 | Sundry precautions |
126 | Precautions where gas exists |
127 | Shot-firing |
128 | Signaling |
Indian Electricity Rules PDF For UPPCL JE | |
129 | Haulage |
130 | Earthing of neutral points |
131 | Supervision |
132 | Exemptions |
MISCELLANEOUS | |
133 | Relaxation by Government |
134 | Relaxation by inspector |
135 | Supply and use of energy by non – licensees and others |
136 | Responsibility of agents and managers |
137 | Mode of entry |
138 | Penalty for breaking seal |
Indian Electricity Rules PDF For UPPCL JE | |
138A | Penalty for breach of rule 44A |
139 | Penalty for breach of rule 45 |
140 | Penalty for breach of rule 82 |
140A | Penalty for breach of rule 77,79 or 80 |
141 | Penalty for breach of rules |
142 | Applications of rules |
143 | Repeal |